USDC funding rates and position payments
Funding is a payment between long and short holders of a perpetual contract. At a positive rate, longs pay shorts. At a negative rate, shorts pay longs.
MSK
Exchanges with current rates
8
Range normalized to 8 hours
0.0000% → +0.0100%
Where the selected side receives funding
Long: 0 of 8
Calculate one funding payment
The full position value in USD. For a leveraged position, this is collateral multiplied by leverage.
Long on OKX · USDC-USDT-SWAP
Zero payment
10 000.00 USD × 0.0000% per 8 h
One settlement calculated from the displayed rate and position notional. Trading fees and profit or loss from price changes are calculated separately.
Compare current funding rates
Rows are ordered by the payment to the selected side over the same eight hours. The original rate and single payment apply to each contract’s own interval.
| Exchange / contract | Rate per interval | 8-hour equivalent | One paymentUSD equivalentLong · 10 000.00 USD | Next settlement |
|---|---|---|---|---|
|
OKX
USDC-USDT-SWAP
Rate as of MSK
Open exchange ↗ |
0.0000% per 8 h | 0.0000% | Zero payment | MSK |
|
MEXC
USDC_USDT
Rate as of MSK
24-hour volume: 469 130 USD |
+0.0025% per 8 h | +0.0025% | Pays 0.25 USD | — |
|
Binance
USDCUSDT
Rate as of MSK
24-hour volume: 1 358 043 USD |
+0.0025% per 8 h | +0.0025% | Pays 0.25 USD | MSK |
|
Gate.io
USDC_USDT
Rate as of MSK
Open exchange ↗ |
+0.0069% per 8 h | +0.0069% | Pays 0.69 USD | MSK |
|
Bybit
USDCUSDT
Rate as of MSK
Open interest: 7 533 738 USD 24-hour volume: 126 074 USD |
+0.0079% per 8 h | +0.0079% | Pays 0.79 USD | MSK |
|
KuCoin
USDCUSDTM
Rate as of MSK
24-hour volume: 18 860 USD |
+0.0088% per 8 h | +0.0088% | Pays 0.88 USD | MSK |
|
Aster
USDCUSDT
Rate as of MSK
Open exchange ↗ |
+0.0100% per 8 h | +0.0100% | Pays 1.00 USD | MSK |
|
Bitget
USDCUSDT
Rate as of MSK
Open interest: 3 216 968 USD 24-hour volume: 9 901 USD |
+0.0100% per 8 h | +0.0100% | Pays 1.00 USD | — |
How rates and payments are calculated
The 8-hour equivalent is the rate per interval × 8 ÷ interval hours. It makes different intervals comparable. One payment is position notional × the original rate. The annualized equivalent in the history is a linear conversion of the rate to one year.
USDC funding questions
Who receives funding when the USDC rate is positive?
At a positive rate, long holders pay short holders. At a negative rate, the direction reverses. The payment depends on the position notional and the rate of the specific contract.
Should I multiply the payment by leverage again?
No, if the calculator already contains the full position notional. Leverage is used once: position notional equals collateral multiplied by leverage.